This is my first ever ride over 500km, which is 562km from
Senawang to Kuala Perlis Ferry.
Only 4 of us, Wak, Arip, Imal and me. Our journey
began on 25th January, 11p.m.
Overall, the expenses for accommodation, fuel, food, island
hopping, and et cetera was around RM800.
It is quite expensive if compared to other method of travelling, but riding
experience that matters, right.
We all gathered at PETRON Seremban (RnR) and had few stops
every 100++ kilometres.
1st Stop : Tanjung Malim
2nd Stop : Tapah
3rd Stop : Semanggol
4th Stop : Gurun
5th Destination : Kuala Perlis Ferry
We reached Kuala Perlis Ferry at 5.20 a.m. 562km ride was
hell. Rain poured heavily for almost half of the journey. I was mentally dispirited
by the long ride.
Shell Senawang |
PETRON Seremban (RNR) |
Semanggol |
Gurun |
Kuala Perlis, Masjid Terapung |
Masjid Terapung |